Saturday, April 7, 2012

NFPA 110 Requirements for Testing Your Generator

NFPA 110 Requirements for Testing Your Generator


The National Fire Protection Association (NFPA) sets minimum standards for egress safety in commercial buildings. This includes standards for standby generators (a.k.a. gensets), which in many buildings, are responsible for powering emergency egress lighting (a.k.a. backup lighting). NFPA 110 contains the association's guidelines for generator testing for buildings that require a Level 1 or Level 2 generator. Testing requireMents are as follows:

NFPA 110 Requirements for Testing Your Generator

NFPA 110 Requirements for Testing Your Generator

NFPA 110 Requirements for Testing Your Generator


NFPA 110 Requirements for Testing Your Generator



NFPA 110 Requirements for Testing Your Generator

Monthly Testing (Section 8.4.2.)

A genset should be tested under load for 30 minutes each month. A successful test can be judged in one of two ways: when the load raises genset exhaust gas to the minimum temperature that the manufacturer recomMends for monthly testing, or when a gensetruns at a minimum of 30% of its nameplate Kw rating for at least 30 minutes.

Some generators cannot operate until their water pressure and oil pressure to establish. For these generators, the 30-minute test should be concluded in less time to allow them to standby resume sooner than later.

Alternate Testing for Diesel Generators (Section 8.2.4.3)

Diesel generators that don't achieve the proper exhaust temperatures or fail to operate at 30 percent of the Kilowatt nameplate rating for at least 30 minutes should be (a) exercised under load for 30 minutes each month, and (b) exercised under-supplied load (i.e. from a load bank) for approximately two hours each year.

When conducting the test, yearlytesters should operate a genset for 30 minutes at 25 percent of its nameplate Kw rating, 30 minutes at 50 percent of its nameplate Kw rating, and 60 minutes at 75 percent of its nameplate Kw rating.

Companies that don't have emergency power Supply system (EPSS) technicians on staff should have a commercial power solutions provider perform NFPA 110 requireMents for generator testing.

The Importance of NFPA Generator Testing

Most commercial buildings are subject to a combination of federal, state and municipal codes that govern egress safety, and usually adDress backup lighting. Occupational Safety and Health Administration (OSHA) standards determine federal egress codes, while International Building Code(IBC), International Fire Code (IFC), OSHA and NFPA standards, determine state and municipal codes.

When a building features generator-powered backup lighting that is subject to federal, state, and/or municipal codes, it is also subject-either by code or implication to keeping and maintaining a working genset. When a genset malfunctions, so does generator-powered backup lighting-an occurrence that could lead to deadly egress jams.

In addition to issuing testing guidelines for generators, the NFPA has issued guidelines for testing backup lighting, and guidelines for impleMenting luminescent exit routes egress stripes in. In combination, these guidelines ensure that buildings are well prepared for low visibility evacuations, which protects building owners againstinjury claims, wrongful death claims, and workers comp claims that result from botched evacuations.

If your building is subject to NFPA testing guidelines for generators, conducting monthly and/or annual testing can ensure that it and the equipment that it would power are ready for a power ouTAGe. For emergency power equipment testing, call a commercial power solutions provider today.

NFPA 110 Requirements for Testing Your Generator

Tuesday, March 20, 2012

NFPA 110 Generator Testing: An Overview

NFPA 110 Generator Testing: An Overview


The National Fire Protection Association (NFPA) creates minimum standards for fire safety egress safety, and other types of safety in commercial buildings. Included in the NFPA's safety standards is a code for testing and maintaining emergency power Supply systems (EPSS): NFPA 110. If your building contains a generator, practicing the code can ensure that it performs as expected during a power ouTAGe. Below are the basic testing requireMents for industrial generators according to NFPA 110. For a full list of requireMents, building managers should contact the NFPA, or a commercial power solutions provider.

NFPA 110 Generator Testing: An Overview

NFPA 110 Generator Testing: An Overview

NFPA 110 Generator Testing: An Overview


NFPA 110 Generator Testing: An Overview



NFPA 110 Generator Testing: An Overview

NFPAtesting for industrial generators

If a building is required to have a Level 1 or Level 2 generator, thefollowing types of NFPA 110 generator testing should be performed in preparation for a power ouTAGe. Experts trained in EPSS technology should carry out these tests.

Section 8.4.2
An EPSS must be exercised under load once a month for at least thirty minutes. The test should be conducted using one of the following two methods:

Loading that achieves a minimum temperature for exhaust gas based on the manufacturer's recommendations. Under normal operating temperatures while running at a minimum of 30% of the nameplate Kw rating.

For generators that cannot operate until their water pressure and oil pressure have stabilized, the tests above should be terminated before the thirty minutes expire. This reduces the time to> generator is unavailable for operation.

Section 8.2.4.3
Diesel powered generators that do not meet the requirements set forth in Section 8.4.2 should be exercised monthly for at least thirty minutes using the available EPSS load, and yearly for two hours using a supplied load. For yearly tests, the two hours should be broken down as follows:

30 minutes at 25% of the nameplate Kw rating. 30 minutes at 50% of the nameplate Kw rating. 60 minutes at 75% of the nameplate Kw rating.

To load bank can provide the "supplied load" required for tests under Section 8.2.4.3. Load banks, as well as diesel-powered generators, are available for short-term and long-term rental from commercial power solutionproviders.

The scope and benefits of NFPA EPSS testing

The requirements above are not a complete list of NFPA 110 generator testing requirements. To determine the necessary maintenance measures and tests needed for your unique generator, consult the code in its enTirety. By following its requirements, the following benefits can be realized:

Improved reliability of emergency backup lighting. Reduced possibility of electricity interruption in critical facilities. Reduced layover time at break before make generators. Improved emergency power generation capacity.